Butendiek Offshore Windfarm
Site / Client
Bladt Industries A/SOffshore Wind Germany GmbH, Lubmin
Location
Germany and DenmarkQualification
- Welding supervision (IWE)
- QA/QC-Manager
- HSE-Manager
Tasks / Scope of work
- Supervision of welding activities during manufacturing of 80 transition pieces.
- Issue of welding procedure specification (WPS).
- Leader QA-Team.
- Internal Inspections.
- Approval with clients and certifiers (DNV / GL).
- Project documentation.
- Safety walkabout with BG and client, initiation sanctions.
- Assembly and welding of primary and secondary steel parts (console for platform, stopper sheet etc.).
- After welding the transition pieces (by EEW), assembly and welding of packages in- and outside the transition pieces (internal and external platforms, ladders, boat landing etc.).
- After coating the transition pieces and packages, final assembly of the packages in- and outside the transition pieces.
- Handing over the built-up transition pieces to vendor.

Más referencias para energía eólica
Alemania
Sede central
Bahnhofstrasse 14
79774 Albbruck
teléfono: +49 7753 978 467
envíe un correo electrónico a Steel Inspect
Sede central
Bahnhofstrasse 14
79774 Albbruck
teléfono: +49 7753 978 467
envíe un correo electrónico a Steel Inspect
Suiza
STEEL INSPECT Schweiz Gmbh
Staldenstrasse 27
5417 Untersiggenthal
teléfono: +41 79 593 99 07
envíe un correo electrónico a Steel Inspect
STEEL INSPECT Schweiz Gmbh
Staldenstrasse 27
5417 Untersiggenthal
teléfono: +41 79 593 99 07
envíe un correo electrónico a Steel Inspect
Reino Unido
STEEL INSPECT UK Ltd.
Portland House
Belmont Business Park
Durham
DH1 1TW
Teléfono: +44 203 442 04 50
Envíe un correo a Steel Inspect UK Ltd.
STEEL INSPECT UK Ltd.
Portland House
Belmont Business Park
Durham
DH1 1TW
Teléfono: +44 203 442 04 50
Envíe un correo a Steel Inspect UK Ltd.