SFNY, MRJN and HSBH field
Client
IMCC / Gulf Piping Group
Location
Abu Dhabi
Description
Permanent welding supervision, QA/QC for manufacturing and loadout of 9 SSS jackets.
IMCC scope of work
Engineering & construction of 9 jackets for further development of the offshore Marjan, Zuluf, Berri, Hasbah, and Safaniya fields of Saudi Aramco. 8 oil fields and 1 gas field.
summary of jacket activities in IMCC
- Pre fabrication of conductor guide frames.
- Assembly of jacket leg.
- Installation of cross bracings with legs.
- Installation of anode bars.
- Erection of conductor guide frames at different elevations.
- Installation of jacket lifting pad-eye, j tubes, risers, bollards & monel sheathing.
- Fabrication of drill deck & boat landings.
- Leak test of monel sheathings, risers & grout lines.
- Upending of jacket after completion of major structure.
- Trial fit-up of boat landings & drill deck.
- Jacket leg gauging inspection.
- Weighing of jacket.
- Sea fastening with the barge.